问题:
When should I run SPC?
答案:
Signal Path Compensation (SPC) can be run at any time. The best times to run SPC are:
- After the oscilloscope has been powered on and has warmed up for 20 minutes or more.
- If the temperature has changed more than 5 degrees C since the last SPC was run.
- Prior to making a critical measurement.
此常见问题适用于:
产品系列: DPO7000 MSO/DPO70000DX 混合信号/数字荧光示波器 MSO3000 / DPO3000 MSO4000 / DPO4000 MSO/DPO5000B 混合信号示波器
产品:
常见问题 ID 60156
查看所有常见问题 »