联系我们

与泰克代表实时聊天。 工作时间:上午 9:00 - 下午 5:00(太平洋标准时间)。

电话

致电我们

工作时间:上午9:00-下午5:00(太平洋标准时间)

下载

下载手册、产品技术资料、软件等:

下载类型
型号或关键字

反馈

When should I run SPC?

问题:

When should I run SPC?

答案:

Signal Path Compensation (SPC) can be run at any time. The best times to run SPC are:

  • After the oscilloscope has been powered on and has warmed up for 20 minutes or more.
  • If the temperature has changed more than 5 degrees C since the last SPC was run.
  • Prior to making a critical measurement.

常见问题 ID 60156

查看所有常见问题 »