问题:
Why is Option 4M required with TDSHT3?
答案:
Eye diagram measurement requires 16M data and clock channels, which needs to be acquired simultaneously. So the software requires option 4M.
此常见问题适用于:
无产品系列
产品:
常见问题 ID 60276
查看所有常见问题 »