联系我们

与泰克代表实时聊天。 工作时间:上午 9:00 - 下午 5:00(太平洋标准时间)。

电话

致电我们

工作时间:上午9:00-下午5:00(太平洋标准时间)

下载

下载手册、产品技术资料、软件等:

下载类型
型号或关键字

反馈

I have VXI mainframe with a GPIB-VXI/C GPIB controller. Some of the instruments in this mainframe fail to initialize properly. What can I do to solve this problem?

问题:

I have VXI mainframe with a GPIB-VXI/C GPIB controller. Some of the instruments in this mainframe fail to initialize properly. What can I do to solve this problem?

答案:

The VXI specification requires instruments to be ready within 5 seconds of power-up. Some instruments are sensitive to this timing. Current model GPIB-VXI/C Slot 0 modules are shipped with the delay set to appromimately 2 seconds. Therefore, RESMAN runs as soon as the Slot 0 is ready. This setting may cause initialization problems for some instruments. The solution is simply to increase the delay time to a setting of 5 seconds. This holds of the running of RESMAN allowing all the modules to be ready for it to run.

Information on how to perform this change is provided in the "Change Configuration Information" paragraph of section 4 in the National Instruments GPIB-VXI/C User Manual. These are the basic steps to make the needed changes.Information on how to perform this change is provided in the "Change Configuration Information" paragraph of section 4 in the National Instruments GPIB-VXI/C User Manual. These are the basic steps to make the needed changes.

  1. Connect an ANSI terminal or emulation program to the Slot-0 serial port.
  2. Set the communication protocol for 9600,8,N,1.
  3. Power up the VXIbus mainframe.
  4. At the prompt, enter "CONF."
  5. Select #3.
  6. Select #3.
  7. Change delay time to 5 (or what ever you prefer).
  8. Select "Q."
  9. Select #5.
  10. Select #6.

此常见问题适用于:

无产品系列

产品:

常见问题 ID 61896

查看所有常见问题 »